Skip to main content
Internal Digital Repository System Used by
dPanther
DPanther Main Site
|
mydPanther Home
Search results menu
Print
Send
Save
Share
Home
Virginia Key Trust Home
dPanther Home
dPanther Home
Search Options
Advanced Search
Text Search
Brief View
Table View
Thumbies
Your search of
Virginia Key Beach Park Trust
for
'Architecture' in all subjects
resulted in 36 matching records.
First
Previous
21 - 36 of 36 matching titles
Sort By
:
Rank
Title
Date Ascending
Date Descending
Narrow Results By:
Subject: Topic
Virginia Key Beach Park (Miami, Fla.)
( 36 )
Architecture
( 35 )
Blueprinting
( 3 )
Architecture--Conservation and restoration--Business community participation
( 1 )
Construction
( 1 )
engineering
( 1 )
Invoices
( 1 )
Surveys
( 1 )
Subject: Genre
document
( 24 )
architectural drawings
( 6 )
business correspondence
( 3 )
photo
( 2 )
text
( 1 )
No.
Title
Date
21
Original Plans for the Virginia Key Beach Parking Lot
7/24/1953
22
Preliminary Drawing for the Miniature Train Tunnel
1956-01-26
23
Plan for the Proposed Pavement at the Virginia Key Beach Pavilion Building
4/10/1956
24
Cabana Area Development Plan for Virginia Key Beach
5/9/1956
25
Virginia Beach Tunnel Shelter for Miniature Train
1957-01-17
26
Plans for a Barbecue Grill for the Virginia Key Picnic Shelter
5/15/1958
27
Architectural Survey of a Restroom Building
2000-10-20
28
Virginia Key Trust Invoices to A.R. Toussaint and Associates, Inc. for their Survey Work
2002/2003
29
As Built Survey of the Virginia Key Beach Concession Building
2/28/2002
30
As Built Survey of the Virginia Key Beach Pavilion and Carousel
3/1/2002
31
As Built Survey of the Virginia Key Beach Pavilion and Carousel
3/1/2002
32
Architectural Survey North Bath House
2002-11-14
33
Sandra Vega Email to Richard Heisenbottle Requesting Historical Paint Analysis
2002-11-19
34
Sandra Vega Emails Guy Forchion and David Shorter Selecting Johnson Association Architects to Build the Virginia Key Museum Center
2003-05-05
35
Electrical Service to Carousel Building
9/4/2008
36
Additional Plans for Electrical Service to the Carousel Building
9/4/2008
First
Previous