No. Title Date
1 S-13A Structure Improvements and Hydraulic Design
2 Pollution Control Aspects of Water Management 1971
3 Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding 1982-10
4 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-07
5 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-09
6 Nicodemus Slough/C-19 Project Conceptual Design Report 1986-07
7 Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area 1988-09
8 Monitoring and Operating Plan for C-111 Interim Construction Project 1990-05
9 Data collection, research and evaluation studies 1991-09
10 Storm event of October 8-10, 1991 1991-12
11 Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation 2001-05
12 Flow Rating Analysis Procedures for Pumps 2003-12
13 Rating Analysis for Pump Station G310 2004-03
14 Rating Analysis for Pump Station S13 2004-05
15 Flow Rating Development for New Pump Stations (S319, S361, S362, G370, G370S, G372, G372S, S25B, S26, G420, G420S, S332C, S356) 2004-08
16 Quantifying and Communicating Pumped Storm Water Flows for Real-Time Flood Management 2005-07
17 Evaluating and Improving Flow Data Quality Using Strive Data at Water Control Structures 2005-07
18 Rating Analysis for Pump Station (S140, S331, S6, S7, S8) 2006-02
19 Rating Analysis for Pump Station S2 2007-06
20 Rating Analysis for Pump Station S13 2009-09