No. Title Date
1 S-13A Structure Improvements and Hydraulic Design
2 A report on area B, Dade and Broward Counties: a part of the Central and Southern Florida Flood Control Project 1959
3 Some environmental effects of drainage in Florida 1968
4 Pollution Control Aspects of Water Management 1971
5 Operational analysis of a flood in the lower Kissimmee River basin 1971
6 An approach to operation of a regional primary water control system 1971
7 Statement on the Kissimmee Basin Project presented to the Governor and Cabinet 1972
8 Water management and environmental control in South Florida. 1972
9 Impact of upland marsh on water quality 1974
10 Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding 1982-10
11 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-07
12 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-09
13 Nicodemus Slough/C-19 Project Conceptual Design Report 1986-07
14 Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area 1988-09
15 Monitoring and Operating Plan for C-111 Interim Construction Project 1990-05
16 Data collection, research and evaluation studies 1991-09
17 Storm event of October 8-10, 1991 1991-12
18 Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation 2001-05
19 Flow Rating Analysis Procedures for Pumps 2003-12
20 Rating Analysis for Pump Station G310 2004-03