No. Title Date
1 S-13A Structure Improvements and Hydraulic Design
2 A report on area B, Dade and Broward Counties: a part of the Central and Southern Florida Flood Control Project 1959
3 Some environmental effects of drainage in Florida 1968
4 Pollution Control Aspects of Water Management 1971
5 Operational analysis of a flood in the lower Kissimmee River basin 1971
6 An approach to operation of a regional primary water control system 1971
7 Statement on the Kissimmee Basin Project presented to the Governor and Cabinet 1972
8 Water management and environmental control in South Florida. 1972
9 Impact of upland marsh on water quality 1974
10 Agricultural reservoir study 1975
11 Performance of District Structures During Critical Storm Events in West Miami, and Proposed Alternatives to Reduce Flooding 1982-10
12 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-07
13 A wet season field test of experimental water deliveries to northeast Shark River slough, August-November, 1984 1985-09
14 Nicodemus Slough/C-19 Project Conceptual Design Report 1986-07
15 Hydrologic characteristics of the Kissimmee River floodplain Boney Marsh experimental area 1988-09
16 Monitoring and Operating Plan for C-111 Interim Construction Project 1990-05
17 Data collection, research and evaluation studies 1991-09
18 Storm event of October 8-10, 1991 1991-12
19 Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation 2001-05
20 Flow Rating Analysis Procedures for Pumps 2003-12