No. Title Date
501 Draft: Evaluation of Benefits and Impacts of the Hydropattern Restoration Components of the Everglades Construction Project 1996-08-16
502 Water Budget Analysis for the Everglades Nutrient Removal Project (August 19, 1994 to August 19, 1996) 1996-11
503 Walt Dineen Society Annual Conference 1997: Session I 1997
504 Walt Dineen Society Annual Conference 1997: Session II 1997
505 Walt Dineen Society Annual Conference 1997: Session III 1997
506 Walt Dineen Society Annual Conference 1997: Session IV 1997
507 Walt Dineen Society Annual Conference 1997: Session V 1997
508 Walt Dineen Society Annual Conference 1997: Session VI 1997
509 Walt Dineen Society Annual Conference 1997: Session VII 1997
510 First Annual Conference of the The Walt Dineen Society 1997
511 Florida International University: Student Papers from the Honors College (IDH4007) 1997 1997
512 Warmth of the Everglades 1997
513 Water Budget Analysis for the Everglades Nutrient Removal Project 1997-11
514 Quantifying Atmospheric Deposition of Phosphorus: A Conceptual Model and Literature Review for Environmental Management 1998-03
515 Statistical modeling of dry deposition phosphorus rates measured from South Florida 1998-08
516 Water Budget Analysis for the Everglades Nutrient Removal Project (August 20, 1997 to August 19, 1998) 1998-11
517 Hydrogeologic characterization and estimation of ground water seepage in the Everglades Nutrient Removal project 1999-02
518 Variability, uncertainty, and sensitivity of phosphorus deposition load estimates in South Florida 1999-09
519 FCE I proposal - 2000-2006 2000
520 FCE I Project summary 2000