No. Title Date
4501 Ground breaking for rapid transit line. Coral Gables, Florida
4502 Ground water availability assessment for the surficial aquifer on Pine Island, Lee County, Florida 1988-12
4503 A ground water drought management model for Collier County, Florida 1992-02
4504 Ground Water Monitor Well Network Assessment A District Task Force Report 2002-03
4505 The Ground Water Network (GWNET) 1999-03
4506 Ground water quality in the surficial and Floridan Aquifer systems underlying the Upper East Coast Planning Area 1995-09
4507 Ground water resource assessment of Eastern Palm Beach County, Florida 1989-12
4508 Ground water resource assessment of Hendry County, Florida 1988-09
4509 Ground water resource assessment of Hendry County, Florida 1988-09
4510 Groundbreaking Ceremony invitation 2003
4511 Groundbreaking for the Rafael Díaz-Balart Building, Florida International College of Law 2005-05-22
4512 Groundbreaking Frost Art Museum 2003-12-19
4513 Groundbreaking: FIU performing arts building 1995/04/25
4514 Grounds of Hotel Royal Palm, Miami, Fla.
4515 Grounds of the Deering Villa from the air, Miami, Fla. 1920
4516 Groundwater Drought Management by a Feedforward Control Scheme 1994-12
4517 Groundwater head sampling based on stochastic analysis 1997-12
4518 Groundwater quality study of the water conservation areas. 1984-04
4519 Groundwater-surface water interaction along the C-2 Canal, Miami-Dade County, Florida 2008
4520 Groundwater-Surface Water Interaction in Tree Islands: Water Conservation Area 3 Part 1: Phase 1 Well Installation 2001-05